Get 12% OFF Automatically When You Spend $2,000 or More No Code Required
Get 12% OFF Automatically When You Spend $2,000 or More No Code Required

FREE SHIPPING ON ORDERS OVER $1K

EXPERT LIGHTING ADVICE

VALUE ENGINEERED QUOTES

ROI ANALYSIS AND DESIGN SUPPORT

Garvin Industries Base Spacer, 2 x 2 Inch, High Impact Polymer

By Garvin Industries

Note: Product images are for illustration purposes only. Do not rely on product image alone to make a purchase decision. Actual product may vary due to specific configurations. Always refer to spec sheets for details.

Garvin Industries Base Spacer, 2 x 2 Inch, High Impact Polymer

$2.80
MSRP: $6.06
You save $ 3.26 (54%)
  • SKU: GI-1353
  • MPN: 1353

Quick Overview

Heavy-duty 2 x 2 inch base spacer with snap lock design, made from high impact polymer. Ensures consistent duct separation and fast field assembly.

In Stock & Ready To Ship!
Current Stock:Only left:
This item is sold in multiples of 325
Estimate shipping in cart
Call, chat, or email
for support
Ships via

Frequently Bought Together:

Total: Inc. Tax
Total: Ex. Tax
Description

The Garvin Industries Base Spacer, 2 x 2 Inch, is a robust solution designed to support duct arrays within trenching before encasement. As part of Southwire's trusted lineup, this spacer ensures reliable vertical separation and stability for your duct installations.

Key Features and Benefits

  • Proven base plate design keeps ducts evenly spaced
  • Snap lock, two-piece interlock for quick assembly without banding
  • Resistant to extreme temperature fluctuations for durability
  • Heavy-duty strut evenly distributes load
  • Stays firmly in place during fill, reducing installation errors
  • Made from high impact polymers for long-lasting performance

Specifications

  • Spacer Size: 2 x 2 inch
  • Material: High impact polymer
  • Dimensions: 4.46" (A) x 4.25" (B) x 4.46" (C) x 2.50" (D) x 3" (E) x 1.50" (F) x 1.25" (R)
  • Master Quantity: 325 per case
  • Weight per case: 48 lbs

Common Uses

Ideal for supporting duct arrays in trenching projects before encasement, especially in utility, construction, and infrastructure applications.