Get 12% OFF Automatically When You Spend $2,000 or More No Code Required
Get 12% OFF Automatically When You Spend $2,000 or More No Code Required

FREE SHIPPING ON ORDERS OVER $1K

EXPERT LIGHTING ADVICE

VALUE ENGINEERED QUOTES

ROI ANALYSIS AND DESIGN SUPPORT

7ft Long Leader Cable for MPL Fixtures

By Keystone Technologies

Note: Product images are for illustration purposes only. Do not rely on product image alone to make a purchase decision. Actual product may vary due to specific configurations. Always refer to spec sheets for details.

7ft Long Leader Cable for MPL Fixtures

$18.38
  • SKU: KST-KT-MPLLED-LC-7
  • UPC: 843654171197
  • MPN: KT-MPLLED-LC-7

Quick Overview

7ft Long Leader Cable for MPL Fixtures. Built for commercial lighting retrofit, maintenance, and new-installation projects.

WARRANTY 5 YEARS
Availability: 1 business day
In Stock & Ready To Ship!
Current Stock:Only left:
This item is sold in multiples of 16
Estimate shipping in cart
Call, chat, or email for support
Ships via

Frequently Bought Together:

Total: Inc. Tax
Total: Ex. Tax
Description

7ft Long Leader Cable for MPL Fixtures is a Keystone multipurpose for commercial lighting retrofit, maintenance, and new-installation projects.

This Keystone item is configured for commercial lighting retrofit, maintenance, and new-installation projects. Review the listed specifications and resources to confirm fit before ordering.

Key Features and Benefits

  • Keystone Technologies product sourced from the active vendor price sheet.
  • Structured with atomic filter values for wattage, voltage, color temperature, and lumens when available.

Specifications

  • Warranty (Years): 5
  • Light Source: LED
  • Form Factor: Multipurpose